Glued all the bits as previously show, but added a clay layer to fill all the gaps. Getting close to having this finished soon.
Tuesday, February 23, 2021
Tile 3 - Concept - WIP
As a break from working on tile 5, I did a quick mock-up for tile 3.
Im gonna leave the walkways out of this one and use the scatter terrain bridges to link the top of the storage tank to other tiles. Added a bunch of pipes for flavour but intend this tile (in fact nearly ALL tiles) to be a lot more open than tile 5 has come out.
Im gonna leave the walkways out of this one and use the scatter terrain bridges to link the top of the storage tank to other tiles. Added a bunch of pipes for flavour but intend this tile (in fact nearly ALL tiles) to be a lot more open than tile 5 has come out.
Tuesday, February 2, 2021
Hab Block - Building 1 - Finished Build
Finally finished building Hab block building one. Added a bunch of finer detail such as electric cabling, rouble, grit, etc. Pretty happy with how it turned out.
Some close up shots of the finer details.
Hab Block - Building 2 - WIP 3
Slowly coming along in the background with Hab block building two whilst building one is drying. Added the fan, a few widgets and some electiric cabling.
Although not glued yet here is a quick mock up of where I intend this building to go. Added a pipe, storage tank, ladders and the chem silo.
Subscribe to:
Posts (Atom)
-
Glued down all the pipes and the actual bridge. Cut out some paper shapes to give me an idea how it'll connect to the two sides. I plan ...
