Sunday, January 3, 2021

Hab block - Building 1 - Wip post 3


Added the large pipes to the side of the main building 


Added a doorway to the roof access stairwell. More details to come later.

Finished the tin shack. Now has the two remaining sides filled in and a corrigated iron roof.