Tuesday, June 22, 2021

Tile 9 - Bridge - WIP

A bit of a change from the initial bridge here, as I felt it was too high off the ground, but the core idea remains the same. To make the water/sewage area feel larger I reduced the ground level to just the corner edges and then built catwalks over the top 



I have given the bridge itself a bit more structure to its walkway and some early catwalk work for the edges of the tile. Pretty happy with this as an early WIP.

No comments:

Post a Comment