Tuesday, January 5, 2021

Hab Block - Building 1 - Wip post 4

Roof access stairwell attached with fire escape door added, although not seen properly in these pics. It still needs some work, as Im thinking of filling in the gaps and griming it up with some clay/sand mixture. Hopefully try to dry it too quick in order to make it crack and look knackered but we'll see.


Added some detail to the stairwell side of the building with a ladder for access.


Built a small outhouse type building that I hope looks retro fitted to the main block. Still needs a bit more detail on this side of the building but its getting there.

No comments:

Post a Comment