Project:OvaFlo
Tuesday, January 5, 2021
Hab Block - Building 2 - Wip post 2
Started to add some detail around the lower levels and added a wall and roof.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Tile 9 - Bridge - WIP pt2
Glued down all the pipes and the actual bridge. Cut out some paper shapes to give me an idea how it'll connect to the two sides. I plan ...
No comments:
Post a Comment